Sets of hoses, tubes, cables and hose assemblies that
shorten production times and eliminate hidden costs.

Smart OEM kits

Sets of hoses, tubes, cables and hose assemblies that
shorten production times and eliminate hidden costs.

Smart kits:

Smart kits:

Smart kits:

Smart kits:

Hoses in traditional coils

Hoses in traditional coils

They significantly reduce purchase costs and production times

They are sets of hoses, tubes and cables cut to the correct length, on which the indicated accessories can be mounted to eliminate preparation costs on your side. Each section will be properly marked to shorten identification times and eliminate assembly errors. Finished semi-finished products can be bundled and packed in the correct order to synchronize taking out the box with each production operation. Each set may contain check-lists informing about the content and connection points, as well as instructions for correct montage, easy to understand even for employees with no experience, and even those who can’t speak the local language.

Hose cutting to length

Hose marking

Accessories installing

We connect the hoses into bundles, which we pack in the right order, in accordance with the production process. We also mark cartons.

Hose cutting to length

Bundle packing

Box marking

We connect the hoses into bundles, which we pack in the right order, in accordance with the production process. We also mark cartons.

Check-list

Montage manual

Cost reduction report (TCO)

The kits contain check-lists with information about the products in the carton and assembly instructions, which are also legible for employees without technical experience, and even without knowledge of the local language.

We shorten working times

From hoses through bundles to packaging, we use appropriate marking systems to speed up identification. The sets are supplemented with individually designed assembly instructions, so that even inexperienced employees, or those who do not speak the local language, can quickly and flawlessly perform their work.

We reduce purchase and production costs

Thanks to our sets, you will eliminate: buying more than you need, hose scrap after cutting from a coil along with the costs of their disposal, or the cost of storing and handling surpluses. Smart OEM kits eliminate all these costs.

We cover the implementation costs

Implementation of smart OEM kits requires verification of current technical documentation, e.g. length, hose markings and connection points. Eko Industrie’s dedicated implementation team will take over this work to save your time and money.

Example components

ECONOMY

MEDIUM

PREMIUM

Cutting hoses to length

Printing information on the hose

Packing sets into a cardboard box

Sticking information labels

Designing assembly manuals

Clamps and plugs

Completing

Installing

Bundling of hoses

Arranging bundles in the correct order

Coverage of implementation costs by Eko Industrie

From local industrial hose reseller
to hose kits producer for the European OEM market

Developing sales
of industrial hoses

1997-2017

Developing sales
of hose kits

2018-2021

Joining with the manufacturer of industrial hoses

2022

Sati Hoses

Check our offer of industrial rubber and PVC hoses. Contact us and ask for an offer for hoses in coils and smart OEM kits. Check availability with us or one of our distributors in the country.
Sustainable development

Agenda 2030

We are involved in the implementation of the sustainable development agenda,
so as not to reduce the chances of meeting the needs of future generations. Chosen
our areas meet the criteria of respect for the environment and progress
social and economic.

THE FUTURE

Industry 4.0

We are working on an intelligent platform that is an extension of our Cloud Computing. Thanks to it, it will be possible to make changes to the technical specifications of the sets, such as their composition, length of individual elements, quantity, descriptions, and packing order. Our clients will be able to make changes remotely, which will shorten and simplify implementation procedures to a minimum. Everything will be able to take place even just before production starts in our plant. Not only will it be possible to track production, the algorithm will indicate the next available production date if the quantities in the adopted schedule are exceeded.